Ready when you are.
Tell us about your site and we'll return a bankable number in days.
THE PROBLEM
Energy deployment for data centers is too slow.
Demand for utility-scale BESS has never been higher, yet the industry still deploys storage the way it deployed generation in 2020 — one custom-engineered project at a time.

04 · Plug-and-Play AC — RapidGrid™
AC connections in minutes, not days. A patented high-voltage, high-amperage connector that turns a BESS site into a field-assembly problem instead of a field-wiring problem.
What it is: A keyed, bolted, one-way connector for every AC termination. Factory-terminated AC wiring with no field cable prep, eliminating cableway seals and inspection failure risk. Keyed, error-proof, touch-safe connection pins. IP67 rated.
Why it matters: Field termination is the biggest source of commissioning delay — RapidGrid deletes the category. Dramatic reduction in skilled field labor demand, multiplies productivity of experienced electricians, eliminates poor-termination reject cycles, and converts BESS and MVT/PCS units into plug-and-play components.
Connector: 800V · 400A multi-position | Conductor support: up to 646 MCM DLO AC | Enclosure: IP67, UL listing Q1 2027
Designed for: AC-coupled BESS (DC in development) | Tooling: Simple hand tools; error-proof | Eliminates: Field terminations · raceway seals
US Pat. No. 11,811,672 B1 · granted Jan 23, 2024.

03 · Pedestal Foundation — GroundCTRL™
A soil-agnostic pedestal foundation system (patent pending) that replaces bespoke foundation design with a catalog selection, integrating grounding and cable-tray supports. A standardized mold, pre-fab rebar cage, and anchor system work on native or compacted grade, and accept helical piles, driven piles, or earth screws — eliminating mass grading, specialized pile-driving equipment, and slow slab forming on most sites.
Pre-engineered, soil-agnostic: the site picks the variant, not the engineer. Library of configurations across soil classes, consistent concrete takeoff per unit, compatible with all major BESS platforms.
What it eliminates: civil complexity was a hidden tax on every BESS project. GroundCTRL pushes it back to near zero for the vast majority of sites — reducing mass grading and earthwork, heavy specialized pile-driving equipment, refusals/remediation/re-driving of deep piles, and slow forming and pouring of slabs.
Patent pending.
Quick-Quoting Process
One pass. Everything you need to decide.
The fewer unknowns at intake, the faster we return a bankable number.
What we need
Sizing: Real power and energy at POI · duration (2/4/6/8-hr, etc.) · site load and PUE
Site & grid: POI voltage · power factor and cycling · application · project location
Commercial: Target COD · warranty term · ownership structure (EPC or ESA) · portfolio scope
What we return
Hardware: AC-integrated BESS units with RapidGrid pre-integrated at OEM factory
Logistics: Shipping from OEM · factory integration · site delivery
Commissioning: Fees, scope, OEM coordination
O&M + warranty: 15-yr standard or 20-yr extended
Compliance: Prevailing wage / DBA / IRA adders, itemized
Portfolio: Threshold pricing at 50 / 100 MWh
Turnaround: 3–5 business days.
what if…?
A battery plant deployed at the speed of the data center it powers. The hardware is patented. The standards are locked. The factory has the cables terminated. All we need is the site.