rapidgrid-hero-background

Speed is the

product.

We don't sell battery storage. We sell the months we give back to the schedule.

RapidGrid™

Ready when you are.

Tell us about your site and we'll return a bankable number in days.

Request a Quote →

12–18mo

STANDALONE BESS

NTP → COD

4–6mo

BOP COMPONENT

LEAD TIMES

4-6mo

INDUSTRY-STANDARD

ENGINEERING

Daily

FINANCING ACCRUES

FROM NTP

THE PROBLEM

Energy deployment for data centers is too slow.

Demand for utility-scale BESS has never been higher, yet the industry still deploys storage the way it deployed generation in 2020 — one custom-engineered project at a time.

Request a Quote →

01 · Design & Engineering

Every project treated like a prototype. One-off single-lines, bespoke layouts, custom structural calcs — first-of-kind effort, every time, on work that should be a catalog selection.

02 · Procurement

Nothing gets ordered until everything is engineered. Every long-lead item — switchgear, MVTs, cabling — sits behind a serial chain of bespoke engineering. By the time procurement starts, lead times have eaten the schedule.

03 · Construction

Months of dirt and concrete before a single unit lands. Mass grading, slab mats, pile re-drives, trenching, field-terminating every run. Work that belongs on a controlled OEM floor, done at 95°F on a gravel pad.

THE APPROACH

The site becomes assembly. Not invention.

We treat the plant itself as a product line. Four components push work upstream — into the factory, the standards library, and the warehouse — and out of the critical path.

01 · Electrical

RapidGrid™ — US Pat. No. 11,811,672 B1. Patented plug-and-play AC connector. Factory-terminated, touch-safe, IP67.

02 · Structural

GroundCTRL™ — Pat. Pend. One pedestal system, soil-agnostic. No bespoke geotech, no concrete mat.

03 · Civil & Library

I&S Library — 30% Package · IFC Library. Pre-engineered layouts, civil sections, cable schedules, BOM logic. Configured per site.

04 · Procurement

Stocked BOP — Pre-Purchased Inventory. Repeat specs let us pre-buy long-lead BOP. Volume pricing in. Lead-time risk out.

THE GRIDWORKS I&S SYSTEM

Configure. Don't redesign.

Every project starts from a 30% design basis, BOM logic, P95 assumptions, and an IFC construction library. Projects are configurations of the platform — not re-inventions of it.

Engineering Basis

Traditional EPC: First-of-kind every project.
Gridworks I&S: 30% I&S package at bid; P95 assumptions let us commit early.

Foundations

Traditional EPC: Mass grading + bespoke concrete mats.
Gridworks I&S: GroundCTRL™ pedestal, selected from a pre-engineered library.

AC Connections

Traditional EPC: Buried conduit, field-terminated cable, inspection rework.
Gridworks I&S: RapidGrid™ plug-and-play; factory-terminated.

BOM & Procurement

Traditional EPC: Finalized in detailed design. Long-lead ordered late.
Gridworks I&S: Pre-purchased, inventoried BOP. Lead time eliminated.

30% → IFP Timeline

Traditional EPC: 4–6 months.
Gridworks I&S: ≤ 6 weeks.

SKE-02 / ELEVATION · 800V · 400A. A patented plug-and-play AC connector that turns field wiring into field assembly.

Construction Image

04 · Plug-and-Play AC — RapidGrid™

AC connections in minutes, not days. A patented high-voltage, high-amperage connector that turns a BESS site into a field-assembly problem instead of a field-wiring problem.

What it is: A keyed, bolted, one-way connector for every AC termination. Factory-terminated AC wiring with no field cable prep, eliminating cableway seals and inspection failure risk. Keyed, error-proof, touch-safe connection pins. IP67 rated.

Why it matters: Field termination is the biggest source of commissioning delay — RapidGrid deletes the category. Dramatic reduction in skilled field labor demand, multiplies productivity of experienced electricians, eliminates poor-termination reject cycles, and converts BESS and MVT/PCS units into plug-and-play components.

Connector: 800V · 400A multi-position  |  Conductor support: up to 646 MCM DLO AC  |  Enclosure: IP67, UL listing Q1 2027
Designed for: AC-coupled BESS (DC in development)  |  Tooling: Simple hand tools; error-proof  |  Eliminates: Field terminations · raceway seals

US Pat. No. 11,811,672 B1 · granted Jan 23, 2024.

PEDESTAL FOUNDATION SYSTEM · 1/2" = 1'-0". A soil-agnostic foundation adapts to the site instead of the other way around.

Construction Image

03 · Pedestal Foundation — GroundCTRL™

A soil-agnostic pedestal foundation system (patent pending) that replaces bespoke foundation design with a catalog selection, integrating grounding and cable-tray supports. A standardized mold, pre-fab rebar cage, and anchor system work on native or compacted grade, and accept helical piles, driven piles, or earth screws — eliminating mass grading, specialized pile-driving equipment, and slow slab forming on most sites.

Pre-engineered, soil-agnostic: the site picks the variant, not the engineer. Library of configurations across soil classes, consistent concrete takeoff per unit, compatible with all major BESS platforms.

What it eliminates: civil complexity was a hidden tax on every BESS project. GroundCTRL pushes it back to near zero for the vast majority of sites — reducing mass grading and earthwork, heavy specialized pile-driving equipment, refusals/remediation/re-driving of deep piles, and slow forming and pouring of slabs.

Patent pending.

Rendering · Pre-Construction Model

This exists in the model long before it exists in the dirt.

Layout, BOM, civil sections, cable schedules, and foundation takeoff — all locked in the I&S standards engine at the proposal stage.

6 Weeks: Kickoff → Permit-Ready

Industry standard is 4–6 months. We're not compressing the same process — we've removed most of it.

Weeks 1–2 — Site assessment & scoping: Geotech, topo, and soil classification through a standardized data intake.

Weeks 2–3

Foundation & site design. GroundCTRL variant selected per site. The standards library does the heavy lifting.

Weeks 3–5

Electrical & structural. Single-lines, layouts, calcs, stamped drawings — all in-house.

Weeks 5–6

Permit package. Stamped civil, structural, electrical — packaged for AHJ review. No revision cycles.

Quick-Quoting Process

One pass. Everything you need to decide.

The fewer unknowns at intake, the faster we return a bankable number.

What we need
Sizing: Real power and energy at POI · duration (2/4/6/8-hr, etc.) · site load and PUE
Site & grid: POI voltage · power factor and cycling · application · project location
Commercial: Target COD · warranty term · ownership structure (EPC or ESA) · portfolio scope

What we return
Hardware: AC-integrated BESS units with RapidGrid pre-integrated at OEM factory
Logistics: Shipping from OEM · factory integration · site delivery
Commissioning: Fees, scope, OEM coordination
O&M + warranty: 15-yr standard or 20-yr extended
Compliance: Prevailing wage / DBA / IRA adders, itemized
Portfolio: Threshold pricing at 50 / 100 MWh

Turnaround: 3–5 business days.

Start a Quote →

what if…?

A battery plant deployed at the speed of the data center it powers. The hardware is patented. The standards are locked. The factory has the cables terminated. All we need is the site.

Request RapidGrid Quote →